offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›REETEC Tests Its Blade Inspection System Offshore
Operations & Maintenance

May 25, 2016 · about 10 years ago

REETEC Tests Its Blade Inspection System Offshore

REETEC GmbH, part of EDF EN Group, has tested a new internal blade inspection system and method on an over 60m long offshore wind turbine blade. The required equipment for REETEC’s new internal blade inspection method, consisting of a high resolution rotary swivel head camera, measurement laser and

1 minutes read
  • LinkedIn
  • X
  • Email

REETEC GmbH, part of EDF EN Group, has tested a new internal blade inspection system and method on an over 60m long offshore wind turbine blade.

The required equipment for REETEC’s new internal blade inspection method, consisting of a high resolution rotary swivel head camera, measurement laser and supporting devices, is installed in about 1 hour.

After the inspection of a blade in a 6 o’clock position, the system automatically generates an inspection report draft as part of the workflow, the company explained.

REETEC performed the test of the internal blade inspection system at an unnamed North Sea wind farm. REETEC said that, by combining data acquisition, data processing, documentation, reporting and, if required, repair activities on- and offshore, it is now able to offer an all-in blade package.

“Next to the offshore test, 15 onshore turbines were tested successfully with the new system, which is now released for all new inspections projects. Simplification and efficacy of wind energy technology is a steady motivation for REETEC to develop new and better solutions for our customers as we have done it for about two decades now,” said Claus Sejersen , Technical Director REETEC GmbH.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceR&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

16 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

16 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago