offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›MENCK’s Largest Hammer Set for Burbo Bank 2 Monopiles
News

May 27, 2016 · about 10 years ago

MENCK’s Largest Hammer Set for Burbo Bank 2 Monopiles

MENCK will deploy its largest hammer for the installation of 32 monopiles at the Burbo Bank Extension offshore wind farm. The MHU3500S has a 6.5m pile sleeve, powered by 3 MHP 1600 hydraulic power packs in parallel setup. The hammer will be operated from Van Oord’s offshore construction vessel Svane

1 minutes read
  • LinkedIn
  • X
  • Email

MENCK will deploy its largest hammer for the installation of 32 monopiles at the Burbo Bank Extension offshore wind farm.

The MHU3500S has a 6.5m pile sleeve, powered by 3 MHP 1600 hydraulic power packs in parallel setup. The hammer will be operated from Van Oord’s offshore construction vessel Svanen.

Offshore construction of the 258MW wind farm is scheduled to start in June.

Burbo Bank Extension will comprise 32 MHI Vestas 8MW wind turbines. The wind farm, located 8 kilometres off the coast in Liverpool Bay, UK, is an addition to the operational Burbo Bank offshore wind farm.

The first of 32 8MW turbines will be installed in September, and commissioning is expected to be completed in 2017.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago