offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Timelapse: Dudgeon Foundation Eased Into Place
Vessels

May 31, 2016 · about 10 years ago

Timelapse: Dudgeon Foundation Eased Into Place

Statoil has shared a timelapse video of one of 67 foundations for the 402MW Dudgeon offshore wind farm being installed in the UK part of the North Sea. The wind farm is located some 32 kilometres north of Cromer, off the coast of Norfolk. The crane vessel Oleg Strashnov has been installing foundatio

1 minutes read
  • LinkedIn
  • X
  • Email

Statoil has shared a timelapse video of one of 67 foundations for the 402MW Dudgeon offshore wind farm being installed in the UK part of the North Sea.

The wind farm is located some 32 kilometres north of Cromer, off the coast of Norfolk.

The crane vessel Oleg Strashnov has been installing foundations for the wind farm since early April.

Dudgeon comprises 67 Siemens 6MW turbines, and is expected to be commissioned by early 2017.

Statoil is the developer and future operator of the wind farm. The Norwegian energy company co-owns the wind farm alongside Statkraft and Masdar.

The total investment in the project, which was officially approved in 2014, is estimated at GBP 1.5 billion.

Dudgeon is being developed near the 317MW Sheringham Shoal wind farm, also developed by Statoil and Statkraft, which has been operational since 2012.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago