offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Burbo Bank Extension Topside Meets Jacket (Gallery)
Wind Farm Update

June 2, 2016 · about 10 years ago

Burbo Bank Extension Topside Meets Jacket (Gallery)

Engie Fabricom and Iemants completed the load-out of the topside for the 258MW Burbo Bank Extension offshore wind farm at the ENGIE Fabricom’s Hoboken yard on 30 May. The 1180-tonne topside was placed next to the 985-tonne offshore substation jacket on the pontoon. The jacket was loaded onto the pon

1 minutes read
  • LinkedIn
  • X
  • Email

Engie Fabricom and Iemants completed the load-out of the topside for the 258MW Burbo Bank Extension offshore wind farm at the ENGIE Fabricom’s Hoboken yard on 30 May.

The 1180-tonne topside was placed next to the 985-tonne offshore substation jacket on the pontoon. The jacket was loaded onto the pontoon on 11 May.

The topside and the jacket are scheduled to leave ENGIE Fabricom’s facilities towards their final destination off the west coast of England in June.

Burbo Bank Extension will consist of 32 turbines and will be the first large-scale wind farm to deploy the new MHI Vestas 8.0 MW turbine. The wind farm is expected to be fully commissioned in the first half of 2017.

The wind farm, located 8 kilometres off the coast in Liverpool Bay is an addition to the operational Burbo Bank.

Photos: Smulders

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago