offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›CRC Galaxy Floated Out (Gallery)
Vessels

June 3, 2016 · about 10 years ago

CRC Galaxy Floated Out (Gallery)

Commercial Rib Charter’s flagship 15-metre MCA Cat 1 cabin Rib, the CRC Galaxy, has been floated out at the Goodchild Marine’s boatyard on the river Waveney in Great Yarmouth. The CRC Galaxy is powered by twin diesel 440hp Volvos with Hamilton Jet drives and is capable of carrying 12 passengers plus

1 minutes read
  • LinkedIn
  • X
  • Email

Commercial Rib Charter’s flagship 15-metre MCA Cat 1 cabin Rib, the CRC Galaxy, has been floated out at the Goodchild Marine’s boatyard on the river Waveney in Great Yarmouth.

The CRC Galaxy is powered by twin diesel 440hp Volvos with Hamilton Jet drives and is capable of carrying 12 passengers plus 3 crew.

The vessel’s navigation suite includes vessel monitoring systems and forward looking infra-red displays, passenger accommodation with heated, air-driven suspension seating and full welfare facilities normally reserved for larger vessels, CRC said.

The custom designed over-the-bow crew transfer apparatus and Hamilton’s Blue Arrow water jet control system enhance the vessel’s manoeuvring capability and ensure safety standards are maintained when transferring passengers at sea.

Other features include access doors fore and aft, a large aft deck, and a bow snubber for transferring crews over the bow. The cabin has heads, shower, galley, drying zone, and matrix system to allow installation of bunks, work benches and instrumentation.

Following the sea trials, the CRC Galaxy will be delivered to CRC on 10 June in Southampton.

The vessel was originally planned for delivery in June 2015, but the addition of new features such as Henriksen Hooks so the vessel can act as a MCA Cat 1 daughter craft, have pushed the delivery back.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

15 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

15 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago