offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›Adwen Moving Towards 8MW Turbine Certification
Technology

June 6, 2016 · about 10 years ago

Adwen Moving Towards 8MW Turbine Certification

The testing of the drivetrain for Adwen’s 8MW offshore wind turbine (AD 8-180) has begun at IWES Dynamic Nacelle Testing Laboratory (DyNaLab) in Bremerhaven (Germany). The drivetrain is undergoing a test campaign that will last until the end of the year, as part of the validation process, which will

1 minutes read
  • LinkedIn
  • X
  • Email

The testing of the drivetrain for Adwen’s 8MW offshore wind turbine (AD 8-180) has begun at IWES Dynamic Nacelle Testing Laboratory (DyNaLab) in Bremerhaven (Germany).

The drivetrain is undergoing a test campaign that will last until the end of the year, as part of the validation process, which will cover mechanical and electrical tests on the integral chain of the drivetrain and main tower components.

By simulating operational conditions for extreme and fatigue loads the tests will enable the validation of these key components. The process will also allow the validation of individual and fully integrated subsystems as well as the complete drivetrain operation at full power.

These tests are paramount to shorten the field test campaign and speed-up the certification of the turbine, Adwen said.

After this first part of the full drivetrain test campaign is concluded, the complete AD 8-180 nacelle will be installed in the prototype, currently being assembled in Bremerhaven, and will be transported to IWES DyNaLab, where it will be subjected to final tests and checks before the prototype is installed in Bremerhaven by the end of this year.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

25 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

26 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

25 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

26 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago