offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Freddie S Supporting Siemens at Westermost Rough
Operations & Maintenance

June 8, 2016 · about 10 years ago

Freddie S Supporting Siemens at Westermost Rough

Windwave Workboats has sent its 18-metre Wind Farm Support Vessel (WFSV) Freddie S to Grimsby to start a new role providing 24-hour jack-up support for Siemens Wind Power Service on the Westermost Rough wind farm. Freddie S will be supporting a team of Siemens’ heavy lift technicians who are working

1 minutes read
  • LinkedIn
  • X
  • Email

Windwave Workboats has sent its 18-metre Wind Farm Support Vessel (WFSV) Freddie S to Grimsby to start a new role providing 24-hour jack-up support for Siemens Wind Power Service on the Westermost Rough wind farm.

Freddie S will be supporting a team of Siemens’ heavy lift technicians who are working on the Sea Challenger jack-up.

The Westermost Rough wind farm has 35 Siemens SWT-6.0-154 6MW wind turbines installed and is located 8 kilometres off the Yorkshire Coast, north of Hull, covering a total area of 35km2. The wind farm was inaugurated in July 2015.

The contract is a double first for Windwave, working on the Westermost Rough wind farm and on a site with 6MW turbines.

Westermost Rough is a joint venture between DONG Energy (50%), Marubeni Corporation (25%) and the UK Green Investment Bank (25%). The wind farm is operated by DONG Energy.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

12 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

12 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago