offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Port of Blyth Chosen as Staging Area for EDF’s New OWF
Operations & Maintenance

June 8, 2016 · about 10 years ago

Port of Blyth Chosen as Staging Area for EDF’s New OWF

EDF Energy Renewables will utilise the Port of Blyth as a mobilisation and operation & maintenance base for its new offshore wind farm to be installed off the coast of Northumberland. Port of Blyth Chief Executive Martin Lawlor said: “We’re delighted to be providing both an operational and mobilisat

1 minutes read
  • LinkedIn
  • X
  • Email

EDF Energy Renewables will utilise the Port of Blyth as a mobilisation and operation & maintenance base for its new offshore wind farm to be installed off the coast of Northumberland.

Port of Blyth Chief Executive Martin Lawlor said: “We’re delighted to be providing both an operational and mobilisation base for this significant offshore wind project and are thrilled that EDF Energy Renewables have selected the Port of Blyth as a key partner. This project further cements our reputation as a major energy port and outlines our capabilities as an offshore energy hub.”

The Blyth Offshore Wind Demonstration Project will be built by EDF Energy Renewables, a UK joint venture between EDF Energies Nouvelles and EDF Energy and will act as a demonstrator site for next generation offshore wind technologies and installation methods.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenancePorts & LogisticsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago