offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Houlder to Arm Pacific Orca for Foundation Installation at Rampion
News

June 13, 2016 · about 10 years ago

Houlder to Arm Pacific Orca for Foundation Installation at Rampion

Houlder today reported that it is completing assembly of a second set of 256t hydraulic Pile Restraint Arms, which will ensure foundation piles at the Rampion offshore wind site are kept vertical as they are hammered into the seabed. The pile-handling arms will be installed on Swire Blue Ocean’s ins

1 minutes read
  • LinkedIn
  • X
  • Email

Houlder today reported that it is completing assembly of a second set of 256t hydraulic Pile Restraint Arms, which will ensure foundation piles at the Rampion offshore wind site are kept vertical as they are hammered into the seabed.

The pile-handling arms will be installed on Swire Blue Ocean’s installation vessel Pacific Orca, where they will provide the horizontal restraint required to resist environmental forces acting on the large foundation piles during installation.

As well as designing the 22m x 8m arms, Houlder has redesigned the vessel attachment and is providing a new grillage support structure.

The grillage support structure is to be placed on the main deck at the aft end of the Pacific Orca vessel and is designed to require no underdeck strengthening and intervention. Furthermore, the design enables fast mobilisation and demobilisation of the equipment as a large proportion of assembly and testing is performed on the quayside prior to vessel arrival, the company said.

Work in Tyneside continues as the arms are installed, said Houlder, which is managing the full installation and commissioning service as part of Rampion Offshore Wind’s equipment lease agreement.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago