offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bard Offshore 1 Clocks Up 3 TWh of Generated Power
Business & Finance

June 17, 2016 · about 10 years ago

Bard Offshore 1 Clocks Up 3 TWh of Generated Power

Bard Offshore 1 marked another first for German offshore wind farms after recently generating 3 TWh of electricity since first starting to produce power in 2013. The wind farm has generated 1 TWh of electricity since November 2015, when Ocean Breeze Energy announced the wind farm reaching the 2 TWh

1 minutes read
  • LinkedIn
  • X
  • Email

Bard Offshore 1 marked another first for German offshore wind farms after recently generating 3 TWh of electricity since first starting to produce power in 2013.

The wind farm has generated 1 TWh of electricity since November 2015, when Ocean Breeze Energy announced the wind farm reaching the 2 TWh mark.

Bard Offshore 1 is located 100 kilometers northwest of Borkum and comprises 80 BARD 5.0 MW wind turbines with a total capacity of 400 MW. The wind turbines are installed at water depths of up to 40 metres.

Ocean Breeze Energy is the owner and operator of the wind farm. Ocean Breeze is in turn 100% indirectly held by UniCredit Bank AG, Munich.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceGrid ConnectionOperations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago