offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Shoreline, Fred. Olsen Find Best O&M Solution for Large OWFs
Operations & Maintenance

June 28, 2016 · about 10 years ago

Shoreline, Fred. Olsen Find Best O&M Solution for Large OWFs

Using an offshore accommodation platform combined with fast in-field vessels will be key to maximising efficiencies for large offshore wind farms built far from shore, according to an O&M logistics study carried out by Shoreline for Fred. Olsen Ocean. An O&M simulation, conducted by using Shoreline’

2 minutes read
  • LinkedIn
  • X
  • Email

Using an offshore accommodation platform combined with fast in-field vessels will be key to maximising efficiencies for large offshore wind farms built far from shore, according to an O&M logistics study carried out by Shoreline for Fred. Olsen Ocean.

Three scenarios with different marine logistics combinations were modelled.

All three scenarios included the use of a helicopter for troubleshooting and additional CTVs over the summer period for scheduled maintenance. The metocean data was taken from weather observations over 18 years – between February 1994 and January 2012 – so factored in seasonal changes, and included significant wave height and mean wind speed.

The key finding of the simulation, which used a maintenance strategy with specific work order priorities, emergency response time limits and two types of technicians, was that time availability was highest in the third scenario – that of a fixed offshore accommodation platform being used in partnership with larger CTVs.

Fred. Olsen Windbase Project Director David Matthews said that the initial input data for each of the specified base cases was realistic but optimistic, however sensitivity analysis was also included in the report, to consider worst case scenarios as well.

“All three scenarios performed with relatively high time based results, but the best availability – nearly 98% – was with the scenario employing three CTVs combined with an offshore accommodation platform,” Matthews said. “The main difference was that the scenarios relying on the vessels equipped with walk-to-work access system had less availability when the overall workload was increased because of their low in-park speed in dynamic positioning mode and the limited number of access systems deployed.”

“On larger projects the robustness of the solution chosen is tested as the failures rise. We quickly saw which solution started to fail first and quickest. In short the distances between failures on any given day showed that multiple low cost access vessels performed best,” Matthews added. “The modelling coupled with a site specific day rate and scope, allows developers to model a fixed offshore facility against other solutions in offshore wind.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceR&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago
New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

21 days ago