offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›STX Starts Working on Arkona OSS
News

June 30, 2016 · about 10 years ago

STX Starts Working on Arkona OSS

STX France has cut the first steel for the Arkona electrical offshore substation, thus launching the first production works for the project after a year of detailed design phase. The structure will be built by the end of 2016, followed by upending and painting, with hundred people mobilized for the

1 minutes read
  • LinkedIn
  • X
  • Email

STX France has cut the first steel for the Arkona electrical offshore substation, thus launching the first production works for the project after a year of detailed design phase.

The structure will be built by the end of 2016, followed by upending and painting, with hundred people mobilized for the works.

Under the EPCI contract signed with AWE Arkona Windpark Entwicklungs GmbH (50% E.ON and 50% Statoil), STX will provide the jacket foundation, piles, substation topside, as well as the transportation and installation at sea. The contract also includes a one-year maintenance period.

STX France has selected Schneider Electric for the supply of the full electrical package and ABB for the electrical transformers. Seaway Heavy Lifting will be in charge of the transport and installation operations.

“This will be the biggest single-lift AC substation ever installed and a point of reference for the sector,” said STX Offshore Energy Business Unit Director, Frédéric Grizaud . “This project shows that we are now an established offshore wind EPCI market player.”

Arkona is situated in the German part of the Baltic Sea and will comprise 60 6MW Siemens turbines scheduled for commissioning in 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago