offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Burbo Bank Extension OSS In Place
Wind Farm Update

July 4, 2016 · about 10 years ago

Burbo Bank Extension OSS In Place

The topside of the substation for Dong Energy’s 258MW Burbo Bank Extension offshore wind farm was installed on 25 June, Smulders reported. The substation topside and jacket left Engie Fabricom’s Hoboken yard in Belgium on 15 June. A consortium of ENGIE Fabricom and Iemants has been contracted by DON

1 minutes read
  • LinkedIn
  • X
  • Email

The topside of the substation for Dong Energy’s 258MW Burbo Bank Extension offshore wind farm was installed on 25 June, Smulders reported.

The substation topside and jacket left Engie Fabricom’s Hoboken yard in Belgium on 15 June.

A consortium of ENGIE Fabricom and Iemants has been contracted by DONG Energy for the fabrication of the offshore substation.

The load-out of the 985-tonne jacket took place at the Smulders yard on 11 May. The jacket was transported by the Matador 3 from the dry dock to the Engie Fabricom yard, where it was placed on a transportation barge. On 30 May, the substation was rolled out and joined the jacket on the barge.

Burbo Bank Extension will comprise 32 MHI Vestas 8MW wind turbines. The wind farm, located 8 kilometres off the coast in Liverpool Bay, UK, is an addition to the operational Burbo Bank.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago