offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›World’s Longest Blade Takes the Road to Aalborg (VIDEO+Gallery)
Technology

July 5, 2016 · about 10 years ago

World’s Longest Blade Takes the Road to Aalborg (VIDEO+Gallery)

On the night of June 30, the world’s longest wind turbine blade made a 218-kilometer trip from LM Wind Power’s factory in Lunderskov to Aalborg, where it will undergo further testing. The 88.4-metre blade, specifically designed for Adwen’s AD 8-180 wind turbine model, will now commence testing as pa

1 minutes read
  • LinkedIn
  • X
  • Email

On the night of June 30, the world’s longest wind turbine blade made a 218-kilometer trip from LM Wind Power’s factory in Lunderskov to Aalborg, where it will undergo further testing.

The 88.4-metre blade, specifically designed for Adwen’s AD 8-180 wind turbine model, will now commence testing as part of Adwen’s product validation plan.

Koos van der Zee , Blade Transportation Senior Manager, said: “The whole experience was amazing – hundreds of people lining the streets and bridges, to watch the world’s longest blade pass.

“The entire trip went smoothly, without any problems, thanks to incredible teamwork between all the companies involved, including our colleagues at LM Wind Power, the police and the highway agency.”

To transport the world’s longest blade on Danish roads, the entire route was carefully mapped out in advance and specialists were ready to temporarily dismantle guardrails and sign posts where necessary.

The full cargo measured just under 100 meters long, with a loaded height of 4.47 meters at its highest point – allowing for only 3 centimeters of extra space when passing under bridges.

Check out LM Wind Power’s video on transporting the LM 88.4 P blade:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

25 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

25 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago