offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Brave Tern All Set for Block Island
Vessels

July 8, 2016 · about 10 years ago

Brave Tern All Set for Block Island

Fred. Olsen Windcarrier’s jack-up installation vessel Brave Tern has successfully mobilised in Esbjerg, Denmark, for the 30MW Block Island, the first offshore wind farm in US waters. Mobilisation included welding of large steel structures on deck to elevate and support the nacelles for the planned t

1 minutes read
  • LinkedIn
  • X
  • Email

Fred. Olsen Windcarrier’s jack-up installation vessel Brave Tern has successfully mobilised in Esbjerg, Denmark, for the 30MW Block Island, the first offshore wind farm in US waters.

Mobilisation included welding of large steel structures on deck to elevate and support the nacelles for the planned transatlantic voyage.

Brave Tern is now en route to St. Nazaire, France, where the five GE Renewable Energy’s Haliade 150-6MW nacelles will be waiting to load onto the vessel. After load-out the vessel will transit across the Atlantic to install the turbines at Block Island wind farm before returning to Europe. The turbine installation is scheduled to start by the begining of August.

Fred. Olsen-related company Global Wind Service (GWS) have been awarded the contract for lift supervision and installation of the GE Renewable Energy’s Haliade 150-6MW wind turbines.

Brave Tern has also been fitted with the ZephIR Lidar 300 to complement the onboard technology with delivery of real-time wind information.

Deepwater Wind’s Block Island is around 3 miles south-east of Block Island, Rhode Island, and is expected to be commissioned by the end of 2016.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago