offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Jee to Carry Out EA1 Array Cable Layout Optimisation Study
R&D

July 12, 2016 · about 10 years ago

Jee to Carry Out EA1 Array Cable Layout Optimisation Study

ScottishPower Renewables has hired Jee to carry out an array cable optimisation study for the East Anglia ONE offshore wind farm. ScottishPower Renewables wants to optimise the wind farm array cable layout, focusing on minimising CAPEX and OPEX. The study will aim to minimise potential loss of reven

2 minutes read
  • LinkedIn
  • X
  • Email

ScottishPower Renewables has hired Jee to carry out an array cable optimisation study for the East Anglia ONE offshore wind farm.

ScottishPower Renewables wants to optimise the wind farm array cable layout, focusing on minimising CAPEX and OPEX. The study will aim to minimise potential loss of revenue should one cable fail, by investigating the effect of different route configurations. The interaction with the seabed is also a major consideration due to the presence of sandwaves. The cost-benefits of adding cable redundancy to the system to minimise downtime will be investigated, Jee explained.

Martyn Campbell , Senior Engineer at Jee said: “We are delighted to be working with Scottish Power Renewables on this project and are looking forward to investigating the interesting environmental challenges presented by the project’s geographical location. Recent seabed surveys have indicated the presence of wrecks, and therefore potential war graves, and areas of metallic debris, thought to be potentially unexploded ordinance (UXO). When planning the route we will need to take care in avoiding these obstacles and will also need to avoid disturbing the protected natural reefs of Sabellaria (a marine worm).”

As part of the study, Jee will also determine the size of cable needed for the various sections of the route. The size of the cable will depend on the power load through it and therefore larger cores will be required nearer the substation. A loop configuration may help to reduce the number of individual sections of larger diameter cable, but the lengths of the cable may increase as a result, the company said.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

26 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

26 days ago

A photo of the Rampion offshore wind farm off Brighton, UK, in sunrise
Featured

Ten Most Read News on offshoreWIND.biz in 2025

about 7 months ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

26 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

26 days ago
A photo of the Rampion offshore wind farm off Brighton, UK, in sunrise
Featured

Ten Most Read News on offshoreWIND.biz in 2025

about 7 months ago