offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Jan De Nul to Install Borkum Riffgrund 2 Monopiles & TPs
Vessels

July 13, 2016 · about 10 years ago

Jan De Nul to Install Borkum Riffgrund 2 Monopiles & TPs

DONG Energy has awarded Jan De Nul with a contract for the transport and installation of 36 monopiles and transition pieces for the Borkum Riffgrund 2 offshore wind farm in Germany, Jan De Nul reported today. Jan De Nul will also be in charge of the supply, transport and installation of scour protec

1 minutes read
  • LinkedIn
  • X
  • Email

DONG Energy has awarded Jan De Nul with a contract for the transport and installation of 36 monopiles and transition pieces for the Borkum Riffgrund 2 offshore wind farm in Germany, Jan De Nul reported today.

Jan De Nul will also be in charge of the supply, transport and installation of scour protection for all foundations.

The works will start in first half of 2018, when Jan De Nul will deploy its jack-up Vessel Vole au vent to install the foundations.

Borkum Riffgrund 2 will have a total export capacity of 450MW, and will feature 56 MHI Vestas’ 8MW wind turbines, 20 of which will be sitting on jacket foundations.

The offshore wind farm will be located 54km off the coast of Lower Saxony, next to Borkum Riffgrund 1.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

12 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

12 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago