offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Bladt Sends Off First Wikinger Jackets
Wind Farm Update

July 14, 2016 · about 10 years ago

Bladt Sends Off First Wikinger Jackets

The first jacket foundations built by Bladt Industries for the Wikinger offshore wind project have left the company’s facilities at Lindø Industripark on a barge early this morning, with Sassnitz in Germany as the next stop. The jacket foundations weigh approximately 650 tonnes and have a footprint

1 minutes read
  • LinkedIn
  • X
  • Email

The first jacket foundations built by Bladt Industries for the Wikinger offshore wind project have left the company’s facilities at Lindø Industripark on a barge early this morning, with Sassnitz in Germany as the next stop.

The jacket foundations weigh approximately 650 tonnes and have a footprint of 23 x 23 metres each. They will be installed in water depths of up to 42 metres.

Bladt Industries has fabricated 41 four-legged jackets and 164 piles for the 350MW Wikinger offshore wind farm, which will consist of 70 wind turbines. The remaining 29 foundations are being produced by Spanish company Navantia, which has also dispatched its first Wikinger foundation .

The foundations will support Adwen’s 5MW turbines, currently being built in Bremerhaven and Stade.

The EUR 1.4 billion Wikinger is scheduled to be operational by the end of 2017.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago