offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Nordsee One OSS Topside Marries Foundation
News

July 14, 2016 · about 10 years ago

Nordsee One OSS Topside Marries Foundation

Following a three-day journey of Nordsee One’s substation platform from Aalborg, Denmark, a floating crane yesterday placed the 2,100-tonne substation onto a 50-meter tall foundation. Matthias Esken, Package Manager for the substation, added: “I’m glad to report that the design and fabrication phase

2 minutes read
  • LinkedIn
  • X
  • Email

Following a three-day journey of Nordsee One’s substation platform from Aalborg, Denmark, a floating crane yesterday placed the 2,100-tonne substation onto a 50-meter tall foundation.

Matthias Esken , Package Manager for the substation, added: “I’m glad to report that the design and fabrication phase was successfully completed on schedule. With installation complete, we are now in the process of offshore commissioning with our suppliers Bladt Industries and Semco Maritime, out of our base harbor in Norderney.

“Looking ahead, in the upcoming weeks the grid operator, TenneT’s export cables and the inter-array will be installed. We will then commission all of the systems, so that we under current planning are ready in autumn for the connection of the wind turbines, which we plan to install early 2017.”

The 54 turbines will be connected to the offshore substation by ten strings of cables, with an overall length of approximately 70 kilometres. The offshore substation will transform the electricity generated by the 54 wind turbines at 33kV to a transmission voltage of 155kV. Submarine high-voltage cables will then transmit the electricity to the grid operator’s converter station, where the AC voltage is transformed to 320kV DC voltage and transmitted to the nearest grid access point at Hagermarsch.

Once completed, Nordsee One wind farm will have an overall installed capacity of 332MW. Under current planning, full commissioning of the wind farm is anticipated in 2017.

Nordsee One is owned by Northland Power Inc. (85%) and RWE International SE (15%).

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago