offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›LM Wind Power Building Blade Factory in Turkey
News

July 18, 2016 · about 10 years ago

LM Wind Power Building Blade Factory in Turkey

LM Wind Power, which recently presented an 88.4-metre blade for Adwen’s offshore wind turbine, has broken ground at a 17-hectare piece of land in Bergama, Turkey, where it will set up a factory for the manufacture and distribution of wind turbine blades. “The Bergama plant will manufacture blades up

2 minutes read
  • LinkedIn
  • X
  • Email

LM Wind Power, which recently presented an 88.4-metre blade for Adwen’s offshore wind turbine, has broken ground at a 17-hectare piece of land in Bergama, Turkey, where it will set up a factory for the manufacture and distribution of wind turbine blades.

“The Bergama plant will manufacture blades up to 70 metres initially for the local market but with the possibility of exporting in the future,” LM Wind Power’s spokesperson said.

The ramp-up to production is expected to start by mid-2017 with an annual capacity of 500MW and an efficient way to expand to 2GW.

LM Wind Power VP Industrialization, Ben Malefijt , said: “In addition to the obvious geographical and logistical benefits this region presents, there’s a noteworthy local talent pool which can benefit from the opportunities. LM Wind Power has an excellent track record for growing and retaining local people from the communities wherever we operate. We expect to do the same here in Bergama.”

The factory is expected to bring up to 450 skilled technical jobs to the area, ranging from manufacturing operations, to technical engineering, services, administration and ancillary support.

The new plant in Turkey will be the 14th LM Wind Power blade manufacturing facility worldwide. In April 2016, LM Wind Power inaugurated a new blade manufacturing plant in Vadodara, India.

LM Wind Power’s 88.4-metre blade, specifically designed for Adwen’s AD 8-180 wind turbine model, recently left the company’s factory in Lunderskov and arrived to Aalborg, where it will undergo further testing as part of Adwen’s product validation plan.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago