offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Burbo Bank 2 to Feature First “Made in UK” Blades
News

July 22, 2016 · about 10 years ago

Burbo Bank 2 to Feature First “Made in UK” Blades

The first six 80-metre long blades for the 258MW Burbo Bank Extension project that yesterday arrived at MHI Vestas’ pre-assembly facility in Belfast, Northern Ireland, will be the first locally built blades to be installed at a UK offshore wind farm. The blades for the V164-8.0 MW turbines were desi

2 minutes read
  • LinkedIn
  • X
  • Email

The first six 80-metre long blades for the 258MW Burbo Bank Extension project that yesterday arrived at MHI Vestas’ pre-assembly facility in Belfast, Northern Ireland, will be the first locally built blades to be installed at a UK offshore wind farm.

The blades for the V164-8.0 MW turbines were designed, tested and manufactured at the MHI Vestas blade factory on the Isle of Wight.

The company’s CEO Jens Tommerup said: “Through investment and collaboration with our partners in the Solent region, we have created jobs, increased training opportunities and stimulated growth throughout the entire supply chain.

“We believe that our efforts reflect the stimulation and growth that the UK has targeted with the continued investment in offshore wind power.”

UK Energy Secretary Greg Clark said: “By building a strong, competitive UK supply chain we are creating jobs, attracting investment, and providing the certainty and confidence businesses need. We are committed to our world-leading offshore wind industry and now we have the first ever offshore wind turbine blades built in the UK by MHI Vestas.”

Belfast Harbour’s Commercial Director, Joe O’Neill , added: “Belfast Harbour is delighted to welcome MHI Vestas and to have the privilege of handling the world’s largest blades in serial production. In 2013, we completed the development of a 200,000 m2 offshore wind terminal, the first bespoke facility of its kind in the UK in order to facilitate this style of operation. Supporting the growth of the renewable energy sector is something we are proud to be a part of and look forward to working with MHI Vestas to ensure the successful completion of the Burbo Bank Extension project.”

Work at MHI Vestas’ pre-assembly site in Belfast commenced in April 2016 and since then the first towers have been fully assembled, tested and pre-commissioned, ready for offshore installation.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago