offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Photo of the Day: Burbo Bank Kit Takes a Dip
Vessels

July 25, 2016 · about 10 years ago

Photo of the Day: Burbo Bank Kit Takes a Dip

DONG Energy has shared a photo showing one of the 32 foundations for the 258MW Burbo Bank Extension wind farm being being installed by Van Oord’s heavy lift vessel Svanen in the waters of Liverpool Bay. Svanen completed the foundations installation work last week, and the installation of the wind fa

1 minutes read
  • LinkedIn
  • X
  • Email

DONG Energy has shared a photo showing one of the 32 foundations for the 258MW Burbo Bank Extension wind farm being being installed by Van Oord’s heavy lift vessel Svanen in the waters of Liverpool Bay.

Svanen completed the foundations installation work last week, and the installation of the wind farm’s offshore cable array is expected to start shortly.

When completed next year, Burbo Bank Extension will be the first large-scale wind farm to deploy the new MHI Vestas 8.0 MW turbine. The first of the wind farm’s 32 turbines will be installed in September.

The Burbo Bank Extension is being developed by Burbo Bank Extension Ltd which is owned by DONG Energy Wind Power (50%), PKA (25%) and Kirkbi A/S (25%).

The wind farm, located 8 kilometres off the coast in Liverpool Bay is an addition to the operational 90MW Burbo Bank.

Image source: DONG Energy

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago