offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›KCI Designs Offshore Power Socket for Elia
Grid Connection

August 1, 2016 · about 10 years ago

KCI Designs Offshore Power Socket for Elia

KCI The Engineers has completed a basic design of a so-called Offshore Switch Yard (OSY), a concept commissioned by Belgian transmission system operator Elia to create a central offshore socket which would bring power from several offshore wind farms to shore. One major long-term objective of the of

2 minutes read
  • LinkedIn
  • X
  • Email

KCI The Engineers has completed a basic design of a so-called Offshore Switch Yard (OSY), a concept commissioned by Belgian transmission system operator Elia to create a central offshore socket which would bring power from several offshore wind farms to shore.

One major long-term objective of the offshore power socket is to concentrate all the available electrical capacity at a single point, so that the energy generated offshore can be transmitted to centres of consumption via direct-current infrastructure to be built offshore.

Until now, all North Sea wind farms have been connected individually to onshore grids. Elia’s plan is to use a modular grid to which wind farms could be connected and which will bring the power to shore through one single OSY.

With the creation of a modular grid or a power socket, wind farms will be connected to a high-voltage substation located on an offshore platform, which will, in turn, be connected to the onshore grid.

KCI has designed the OSY to look like a substation, however, the inside is quite different as no transformer is needed inside the platform seeing that the voltage of the offshore wind turbines has already been changed in the substations from medium to high voltage.

The platform will house 220kV gas insulated switch gear and multiple submarine cable connections. Whereas a substation often has an export cable of around diameter 100-150mm, the cable of the OSY will be much thicker, KCI said.

In the long term, the modular grid infrastructure will be connected to an international platform using direct-current connections. The connections will allow wind power to be stored in dedicated infrastructure when a surplus of energy is generated.

Elia is currently consulting with stakeholders, the relevant authorities and the operators of the offshore wind farms that are still to be built off Belgium – Mermaid, Northwester II, Rentel and Seastar – to decide on the best way to implement this offshore grid.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionR&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

18 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

18 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

21 days ago