offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Wikinger Substation Ready For Sail-Out
Grid Connection

August 8, 2016 · about 10 years ago

Wikinger Substation Ready For Sail-Out

Iberdrola, 50Hertz Transmission GmbH, and Navantia hosted the delivery ceremony of the substation built for the 350MW Wikinger offshore wind farm at Navantia’s premises in Cadiz, on Monday, 8 August. The substation was christened as Andalucía and was built by Navantia entirely at the company’s Puert

2 minutes read
  • LinkedIn
  • X
  • Email

Iberdrola, 50Hertz Transmission GmbH, and Navantia hosted the delivery ceremony of the substation built for the 350MW Wikinger offshore wind farm at Navantia’s premises in Cadiz, on Monday, 8 August.

The substation was christened as Andalucía and was built by Navantia entirely at the company’s Puerto Real shipyard.

The entire structure, which includes a substation, jackets , offshore platform and piles, weighs approximately 8,500 tonnes in total. The substation will be shipped by barge to the German zone of the Baltic Sea during the month of August.

”This contract shores up Navantia’s position as a benchmark constructor for offshore structures in offshore wind farm applications, a growing sector in Europe, primarily in the United Kingdom and Germany,” Navantia’s Chairman José Manuel Revuelta said.

”Moreover, it allows Navantia to diversify its offer and provide work in a sector that is fully complementary to the naval sector.”

The substation Andalucía will become the power core of the offshore wind farm that Iberdrola is constructing in the Baltic Sea, and will distribute the electricity generated by the wind turbines operating in the open sea to shore.

This engineering project was designed by Iberdrola to withstand the extreme weather conditions in the region and comprises two sections, also referred to as superstructures, which will be employed by Iberdrola and 50Hertz, the electricity system operator in this region of Germany.

The Wikinger offshore wind farm will consist of 70 wind turbines, each with a capacity of 5 MW, at a site spanning an area of approximately 34 square kilometres. The EUR 1.4 billion project is scheduled to go online at the end of 2017.

“The prominent role of Spanish industry in this project shines brightly with the construction of the substation and its platform at these Navantia shipyards; the 29 wind turbine platforms at the Navantia shipyards at the Ferrol Ria; the piles that will secure these platforms, the wind turbine towers crafted in Avilés by the Asturian company Windar, and, last but not least, the wind turbines built by Gamesa (Adwen),” Ignacio Galán, Iberdrola’s CEO, said.

”At Puerto Real, the execution of the contract has created jobs for hundreds of workers and involved over 120 regional companies in their capacities as suppliers.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionTechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago