offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›IJmuiden Port Adds More CTV Berthing Space
Operations & Maintenance

August 9, 2016 · about 10 years ago

IJmuiden Port Adds More CTV Berthing Space

Dutch port of IJmuiden has installed two floating jetties at the recently renovated Trawlerkade quay, thus adding 46 metres of extra berthing space for crew transfer vessels used for offshore wind farm operations and maintenance, Amsterdam IJmuiden Offshore Port (AYOP) reports. The floating jetties

1 minutes read
  • LinkedIn
  • X
  • Email

Dutch port of IJmuiden has installed two floating jetties at the recently renovated Trawlerkade quay, thus adding 46 metres of extra berthing space for crew transfer vessels used for offshore wind farm operations and maintenance, Amsterdam IJmuiden Offshore Port (AYOP) reports.

The floating jetties will offer berths for six of Windcat Workboat’s CTVs. A wave protection barrier gives access to both pontoons via two moving walkways. The pontoons are made to give access to the vessels on main deck level. Windcat Workboats transports personnel and material from the dedicated boat landings in the IJmond harbour to offshore wind farms off the coast of IJmuiden.

The floating jetties are equipped with LED lighting, solar panels for navigation lights and connections for shore power. The green power for the jetties is supplied by Eneco, developer and owner of the Princess Amalia and Eneco Luchterduinen offshore wind farms.

AYOP says that the expansion of Trawelkade’s berthing capacity fits into the port’s strategy to position itself as a hub for offshore wind farm O&M operations as well as to help strengthen the offshore wind cluster in the region.

Back in January 2015, IJmuiden constructed three new boat landings for MHI Vestas Offshore Wind and Eneco.

MHI Vestas has a maintenance team stationed at the port, while Eneco uses offices and berthing spaces in IJmuiden for O&M activities at Princes Amalia and Eneco Luchterduinen wind farm.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & Maintenance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago
Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

27 days ago