offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Sif Joins BorWin Gamma Team
Business & Finance

August 10, 2016 · about 10 years ago

Sif Joins BorWin Gamma Team

Dutch Sif Holding N.V. has been awarded a contract for the production of all tubular components for the jacket of the BorWin gamma platform. The contract includes the production of legs, bracings, pile sleeves and pin piles for the jacket. The project is being undertaken by Petrofac in consortium wi

1 minutes read
  • LinkedIn
  • X
  • Email

Dutch Sif Holding N.V. has been awarded a contract for the production of all tubular components for the jacket of the BorWin gamma platform.

The contract includes the production of legs, bracings, pile sleeves and pin piles for the jacket.

The project is being undertaken by Petrofac in consortium with Siemens for the German-Dutch transmission grid operator TenneT.

The jacket for the BorWin gamma platform will be built by Heerema Fabrication Group and will house a Siemens HVDC station that will convert the alternating current produced by the offshore wind turbines to direct current before transmitting it onshore to the German high voltage grid.

The total volume of the tubulars for the platform amounts to approximately 8.6 ktons and production is planned in the last quarter of 2016 and the first half year of 2017.

Heerema Marine Contractors (HMC) will transport and install the jacket in the North Sea at a water depth of up to 40 metres and approximately 100 kilometres off the German coast.

TenneT is developing the offshore AC/DC converter platform BorWin gamma as part of the grid connection project BorWin3. Weighing in at 18,000 metric tonnes, BorWin gamma will be one of the heaviest HVDC platforms ever installed.

The installation is expected to commence in the summer of 2018. Once completed, it will transmit approximately 900MW of wind power.

The platform is scheduled to go online in 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceGrid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago