offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›New Offshore Renewable Plant Optimisation Tool Proposed
Operations & Maintenance

August 24, 2016 · about 10 years ago

New Offshore Renewable Plant Optimisation Tool Proposed

A paper proposing a novel computational tool for the reliability-based assessment of wave, tidal and offshore wind farms was published yesterday in the Journal of Marine Science and Engineering. The paper presents the new tool to identify typical decision problems and to shed light on the complexity

2 minutes read
  • LinkedIn
  • X
  • Email

A paper proposing a novel computational tool for the reliability-based assessment of wave, tidal and offshore wind farms was published yesterday in the Journal of Marine Science and Engineering .

The paper presents the new tool to identify typical decision problems and to shed light on the complexity of optimising a wave power farm. Nevertheless, the tool is exclusively dedicated to marine renewables and adaptable to a range of technologies.

The proposed tool was used to investigate productivity and availability of a wave energy farm during 10 years of operational life. A number of optimization possibilities to improve productivity, namely vessel choice, maintenance regime, failure rate and component redundancy, were then explored in order to assess their effectiveness. The paper quantifies the yield increase and provides a practical approach to evaluate the effectiveness of strategic and operational decision options.

Results, in terms of the variations in productivity and availability of the farm, are analysed and discussed within the paper, with conclusions highlighting the importance of reliability-centred simulations that consider the specific decision parameters throughout the operational life to find suitable solutions that increase the productivity and reduce the running cost for offshore farms.

The computational tool used belongs to the class of Monte Carlo models, which repeatedly perform a non-deterministic calculation in order to obtain the most probable result. The Monte Carlo method coupled with the computational simulation uses a pseudorandom number generator (PRNG) to generate numbers uniformly distributed between zero and one. The implemented tool uses this methodology and the related reliability data to perform the energetic and economic characterization of offshore farms, simulating the failures that limit their availability, and consequently, productivity, the paper reads.

The authors are Giovanni Rinaldi, Philipp R. Thies, and Lars Johanning of College of Engineering, Mathematics and Physical Sciences at the University of Exeter, and Richard Walker from Mojo Maritime.

The work in the paper has been conducted within the multinational Initial Training Network (ITN) OceaNET, funded under the PEOPLE Programme (Marie Curie Actions) of European Union’s FP7, with Mojo Maritime providing access to Mermaid to support, and for integration with, the research.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceR&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago
New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

21 days ago