offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Gemini Chopper Ready for Work
Operations & Maintenance

August 29, 2016 · about 10 years ago

Gemini Chopper Ready for Work

Emden-based HeliService International has taken delivery of its first Leonardo AW169 helicopter which will be used to support Siemens’ personnel during maintenance operations on the 600MW Gemini wind farm off the coast of the Netherlands. The aircraft is on a 5-year contract for winching maintenance

2 minutes read
  • LinkedIn
  • X
  • Email

Emden-based HeliService International has taken delivery of its first Leonardo AW169 helicopter which will be used to support Siemens’ personnel during maintenance operations on the 600MW Gemini wind farm off the coast of the Netherlands.

The aircraft is on a 5-year contract for winching maintenance personnel onto Gemini’s wind turbines and is equipped with a UTC Goodrich winch. The midsized twin-engine helicopter of the 4.8-ton class is the first of its kind, specifically designed for offshore applications. The aircraft can accommodate up to ten passengers in its cabin.

Managing Directors Oliver Freiland, Eberhard Herr, and Nils Herrmann, say: ”After an extensive investigation of all relevant helicopter-types available, we are fully confident of having chosen the perfect match for our offshore customer´s demand for high-quality and safe operation, while being economically efficient.”

Gemini features 150 4MW Siemens turbines, with 130m diameter blades.

Siemens will be using an 84m, helideck-equipped, Service Operations Vessel (SOV), the Windea la Cour , alongside helicopter operations. Built by Ulstein, it will be operated by BS Offshore. The vessel also features a walk-to-work gantry system.

The wind farm’s in-field offshore transformer station is also equipped with a helideck and refuelling facilities.

Van Oord’s offshore installation vessel Aeolus installed the final turbine at the site on 23 August.

The wind farm is being built on two locations close to each other, Buitengaats and ZeeEnergie, situated some 85 kilometers from the coast of Groningen, and the full commissioning is expected in 2017.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceTechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago