offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›DONG Picks Steelwind to Build 36 Borkum Riffgrund 2 Foundations
Business & Finance

August 31, 2016 · about 10 years ago

DONG Picks Steelwind to Build 36 Borkum Riffgrund 2 Foundations

DONG Energy has awarded Germany’s Steelwind Nordenham with a contract to manufacture 36 monopiles and transition pieces for the 450MW Borkum Riffgrund 2 offshore wind farm. This is not the first time Steelwind Nordenham was contracted by DONG to build foundations for an offshore wind project, but it

1 minutes read
  • LinkedIn
  • X
  • Email

DONG Energy has awarded Germany’s Steelwind Nordenham with a contract to manufacture 36 monopiles and transition pieces for the 450MW Borkum Riffgrund 2 offshore wind farm.

This is not the first time Steelwind Nordenham was contracted by DONG to build foundations for an offshore wind project, but it is the first time the company will produce transition pieces for the Danish offshore wind developer. The two companies previously collaborated on foundations for the Race Bank offshore wind farm in the UK.

Once manufactured and delivered in early 2018, the foundations and the transition pieces will be installed by Jan De Nul’s vessel Vole au vent some 54km off the coast of Lower Saxony, next to Borkum Riffgrund 1.

They will support 36 out of the wind farm’s 56 MHI Vestas V164-8.0MW wind turbines. The remaining 20 turbines will be installed on jacket foundations.

Borkum Riffgrund 2 is DONG’s fourth offshore wind farm in German waters. The company decided to build the wind farm in June 2016.

The wind farm is expected to be fully commissioned in the first half of 2019

DONG Energy is the sole owner of Borkum Riffgrund 2, but intends to divest up to 50% of the project at a later stage.

Offshore WIND Staff

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago