offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Nobelwind OSS Ready to Sail Away
News

September 6, 2016 · about 10 years ago

Nobelwind OSS Ready to Sail Away

During the weekend, Bladt Industries loaded out the 1,100-tonne Nobelwind (Belwind 2/ Bligh Bank 2) offshore substation at its production facilities in Aalborg. The installation of the offshore substation is set to take place mid-September. Construction of the substation started in May 2015 and, as

1 minutes read
  • LinkedIn
  • X
  • Email

During the weekend, Bladt Industries loaded out the 1,100-tonne Nobelwind (Belwind 2/ Bligh Bank 2) offshore substation at its production facilities in Aalborg.

The installation of the offshore substation is set to take place mid-September.

Construction of the substation started in May 2015 and, as head entrepreneur on the EPCI project, Bladt Industries has been responsible for the construction of steel, as well as the design, fabrication, commissioning and installation of the substation.

The company has been collaborating with Semco Maritime and ISC throughout the design process, onshore construction, as well as offshore commissioning of electrics and technical systems.

The substation will be installed at the Belwind offshore wind farm site in the North Sea, 45 kilometres off the coast of Belgium, where it will collect power from 50 wind turbines.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago