offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Vallourec to Make MSH Sections for Walney Extension Anode Cages
Wind Farm Update

September 9, 2016 · about 10 years ago

Vallourec to Make MSH Sections for Walney Extension Anode Cages

French tubular components maker Vallourec received an order for 400 tons of MSH sections which will be used as basic structures for the anode cages constituting the corrosion protection system of the Walney Extension offshore wind farm. Walney Extension is a project of DONG Energy UK in the Irish Se

1 minutes read
  • LinkedIn
  • X
  • Email

French tubular components maker Vallourec received an order for 400 tons of MSH sections which will be used as basic structures for the anode cages constituting the corrosion protection system of the Walney Extension offshore wind farm.

Walney Extension is a project of DONG Energy UK in the Irish Sea comprising up to 90 turbines with a total capacity of up to 660 MW.

The MSH sections provided by Vallourec will serve to fix a set of sacrificial anodes which help slowing down the oxidation of the wind turbines’ metal surface.

Prior to their final assembly the tubes will be bent to their specified shape by Kersten Europe.

Bladt Industries, responsible for the anode cage assembly, is specialized in large-scale steel structures including foundations and substructures for wind turbine projects.

The Walney Extension offshore wind farm is being built 9 kilometres off the Cumbrian Coast and is expected to be completed in 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago