offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Photo of the Day: Nobelwind Offshore Substation Installed
Wind Farm Update

September 13, 2016 · about 10 years ago

Photo of the Day: Nobelwind Offshore Substation Installed

The offshore high voltage substation (OHVS) for Belgian Nobelwind offshore wind project, also known as Belwind 2 or Bligh Bank II, has been installed at its destined location in the North Sea, according to Bladt Industries’ social media pages. The company started working on the offshore substation i

1 minutes read
  • LinkedIn
  • X
  • Email

The offshore high voltage substation (OHVS) for Belgian Nobelwind offshore wind project, also known as Belwind 2 or Bligh Bank II, has been installed at its destined location in the North Sea, according to Bladt Industries’ social media pages.

The company started working on the offshore substation in October 2015, following the financial close for the project.

As the main contractor for the offshore substation, Bladt has been responsible for the steel construction work of the substation as well as the overall engineering, procurement, construction and installation of the substation. The company built the substation in close cooperation with its partner Semco Maritime, which carried out the design, onshore construction and offshore commissioning of the high voltage electrical systems and all other technical systems.

The substation’s transition piece was installed at the beginning of August and Nobelwind OHVS left Bladt’s facilities in Aalborg on 8 September .

The 165MW offshore wind farm is expected to be completed in the second half of 2017 and will feature 50 Vestas V112-3.3MW turbines installed some 45 km off the coast of Ostend.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago