offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›E.ON to Build 10MW Lithium-Ion Battery for UK Grid
News

September 14, 2016 · about 10 years ago

E.ON to Build 10MW Lithium-Ion Battery for UK Grid

E.ON will build a 10MW lithium-ion battery for the UK grid, after being awarded a contract from the National Grid to support the power network’s stability with a battery system that will help balance power demand and supply in real time and allow for an increase in the share of renewable energy in t

1 minutes read
  • LinkedIn
  • X
  • Email

E.ON will build a 10MW lithium-ion battery for the UK grid, after being awarded a contract from the National Grid to support the power network’s stability with a battery system that will help balance power demand and supply in real time and allow for an increase in the share of renewable energy in the grid.

With the strong growth of weather-dependent renewable sources such as wind and solar, the amount of power fed into the grid is becoming increasingly volatile. Therefore, National Grid had launched a tender for a new service to deal with volatile fluctuations and awarded 8 contracts.

Batteries are expected to play a key role in the new energy world largely dominated by renewable sources, E.ON said.

At times of either an oversupply or an under-supply, E.ON’s battery system will respond within one second absorbing or discharging power into the local distribution network to which the battery is connected and thus maintaining the system frequency at a safe level.

The company will build the 10MW battery at its Blackburn Meadows Biomass CHP and District Heating site near Sheffield.

The system is planned to be operational by the start of 2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago