offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Icebreaker: LEEDCo Switches from Siemens to MHI Vestas Turbines
Wind Farm Update

September 27, 2016 · about 9 years ago

Icebreaker: LEEDCo Switches from Siemens to MHI Vestas Turbines

LEEDCo, the developer of North America’s first freshwater offshore wind farm, has decided it will use six MHI Vestas Offshore Wind’s (MVOW’s) 3.45MW wind turbines for its Icebreaker project. When asked by Offshore WIND about the decision to switch from Siemens 3MW turbines, Lorry Wagner, President o

2 minutes read
  • LinkedIn
  • X
  • Email

LEEDCo, the developer of North America’s first freshwater offshore wind farm, has decided it will use six MHI Vestas Offshore Wind’s (MVOW’s) 3.45MW wind turbines for its Icebreaker project.

When asked by Offshore WIND about the decision to switch from Siemens 3MW turbines, Lorry Wagner , President of the Lake Erie Energy Development Corporation (LEEDCo), said: “MVOW is our preferred supplier for Icebreaker, but no contract has been signed. It was a decision made after carefully evaluating the AEP [annual energy production] of all turbines in this class as well as the number of similar WTGs deployed offshore.”

Regarding the project’s progress, Wagner said that the current work is focusing on the electrical and cable design, cable route, foundation engineering, and permitting, while ensuring everything is going according to plan as the project moves toward construction.

Last week, the company selected Middough Inc. to provide engineering services for the design and construction of the land-based electric facilities needed to connect the Icebreaker offshore wind farm to the Cleveland Public Power (CPP) Lake Road substation.

In May, the US Department of Energy (DOE) announced it will re-allocate around USD 80 million in funding, initially intended for projects off Oregon and Virginia, to support LEEDCo’s Icebreaker and the University of Maine’s New England Aqua Ventus I projects, saying they ”have demonstrated significant progress toward being successfully completed and producing power.”

With DOE proposing to authorize federal funding to LEEDCo to design, permit, construct and decommission the 6-turbine project, it is requesting public input on the scope of an Environmental Assessment for Icebreaker and will hold a public scoping event tomorrow (28 September), together with the U.S. Army Corps of Engineers (USACE) and the U.S. Coast Guard (USCG).

Offshore WIND Staff

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago