offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Tekmar CPS to Protect Beatrice Inter-Array Cables
Grid Connection

September 28, 2016 · about 9 years ago

Tekmar CPS to Protect Beatrice Inter-Array Cables

Siem Offshore Contractors GmbH (SOC) has selected the UK based Tekmar Energy Ltd to supply the cable protection systems (CPS) for the inter-array grid cable system to be installed at the 588MW Beatrice wind farm off Scotland. In June 2016, SOC was awarded the contract for the turnkey supply and inst

1 minutes read
  • LinkedIn
  • X
  • Email

Siem Offshore Contractors GmbH (SOC) has selected the UK based Tekmar Energy Ltd to supply the cable protection systems (CPS) for the inter-array grid cable system to be installed at the 588MW Beatrice wind farm off Scotland.

In June 2016, SOC was awarded the contract for the turnkey supply and installation package of the inter-array grid cable system for Beatrice.

In addition to the submarine cable installation works, SOC will also provide associated materials and services including the supply of the submarine composite cables, cable protection systems and related accessories as well as post-installation termination, trenching and testing services.

The Beatrice OWF is located approximately 13km of the Caithness coast line in the Outer Moray Firth on the north-western point of the Smith Bank, and features 84 Siemens 7MW wind turbines, which will be inter-connected by 91 x 33 kV medium voltage alternating current submarine composite cables totalling up to 164 km in length.

The offshore works for the package are due to begin in 2017, with project completion scheduled before the end of Q3 2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago