offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Roxtec Seals Off Burbo Bank 2 OSS Holes
News

September 30, 2016 · about 9 years ago

Roxtec Seals Off Burbo Bank 2 OSS Holes

ENGIE Fabricom has contracted Roxtec as a supplier of transits to seal off hundreds of openings for cables and pipes onboard the substation for DONG Energy’s Burbo Bank Extension offshore wind farm. The transits are used for high voltage power cables as well as for signal and fiber optic cables and

1 minutes read
  • LinkedIn
  • X
  • Email

ENGIE Fabricom has contracted Roxtec as a supplier of transits to seal off hundreds of openings for cables and pipes onboard the substation for DONG Energy’s Burbo Bank Extension offshore wind farm.

The transits are used for high voltage power cables as well as for signal and fiber optic cables and in control cabinets. The transits are also used for a wide range of pipe penetrations – from the air-conditioning to the fire-fighting system pipes.

ENGIE Fabricom has prepared for future needs and additional cable routing by installing the company’s transits for 50 percent spare capacity, Roxtec said.

The offshore substation topside and jacket left ENGIE Fabricom’s Hoboken yard in Belgium on 15 June.

A consortium of ENGIE Fabricom and Iemants has been contracted by DONG Energy for the fabrication of the offshore substation.

The load-out of the 985-tonne jacket took place at the Smulders yard on 11 May. The jacket was transported by the Matador 3 from the dry dock to the Engie Fabricom yard, where it was placed on a transportation barge. On 30 May, the substation was rolled out and joined the jacket on the barge.

Burbo Bank Extension will comprise 32 MHI Vestas 8MW wind turbines. The wind farm, located 8 kilometres off the coast in Liverpool Bay, UK, is an addition to the operational Burbo Bank.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago