offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Elsyca’s Design to Keep Blyth Foundations Rust Free
Operations & Maintenance

October 18, 2016 · about 9 years ago

Elsyca’s Design to Keep Blyth Foundations Rust Free

Belgian corrosion protection systems designer Elsyca has created a cathodic protection system for the self-installing concrete gravity based wind turbine foundation structures to be used for the first time at the 41.5MW Blyth Offshore Demonstrator Project. Royal BAM Group has been awarded a contract

2 minutes read
  • LinkedIn
  • X
  • Email

Belgian corrosion protection systems designer Elsyca has created a cathodic protection system for the self-installing concrete gravity based wind turbine foundation structures to be used for the first time at the 41.5MW Blyth Offshore Demonstrator Project.

Royal BAM Group has been awarded a contract by EDF Energy Renewables via SPV Blyth Offshore Demonstrator Ltd, to design, fabricate and install five full-size gravity base foundations for wind turbines at the demo site.

The prototype foundation structures will be pre-fabricated onshore, then towed to the Blyth deployment site where they will be filled with sand/water mixture for lowering them onto a pre-installed gravel bed.

Prediction of the long term efficiency of the corrosion protection system is essential because any survey of the monopile inside the concrete caisson is impossible, Elsyca said.

A correct design of the cathodic protection system and the installation of monitoring devices are crucial for securing the integrity of the monopile during the 26-year service life.

A sacrificial anode system was designed for both internal and external corrosion protection purposes, Elsyca said.

Elsyca’s CPMaster simulation platform was used for the in-depth analysis of the long-term cathodic protection effectiveness.

A first design was made based on DNV OS J-101 and DNV RP B 401 requirements and further refined for the complexity of the foundation structure. The time-dependent modeling approach allowed simulating the evolution of the CP efficiency in the sand filled compartments, Elsyca said.

The five foundations will be installed off the Northumberland coast in the North East of England during the summer of 2017. The foundations will support five optimised MHI Vestas V164-8.0 MW turbines.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceR&DTechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago