offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Gemini O&M Base Takes Final Shape
Business & Finance

October 20, 2016 · about 9 years ago

Gemini O&M Base Takes Final Shape

Dutch construction company Kooi has completed works on an offshore service base in the port of Eemshaven, the Netherlands, which will be used by EMS Maritime Offshore (EMO) and Siemens. The buildings and grounds are spread across an area of 3,500 m2 located within the terminal operated by EMS Mariti

1 minutes read
  • LinkedIn
  • X
  • Email

Dutch construction company Kooi has completed works on an offshore service base in the port of Eemshaven, the Netherlands, which will be used by EMS Maritime Offshore (EMO) and Siemens.

The buildings and grounds are spread across an area of 3,500 m2 located within the terminal operated by EMS Maritime Offshore Nederland, a subsidiary of EMO.

The construction consists of a new 600m² warehouse and a 500m² office building, parts of which will be leased to Siemens.

The construction of the facilities was completed in less than six months.

A floating jetty system measuring 2 x 150 metres in length was completed at the site in September 2015.

Siemens will use the offshore service hub in Eemshaven as the base for its 15-year O&M works on the 600MW Gemini wind farm.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceOperations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

15 days ago