offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›SAL Hits Mother Lode with Walney Extension Contract
Business & Finance

October 20, 2016 · about 9 years ago

SAL Hits Mother Lode with Walney Extension Contract

Hamburg-headquartered SAL Heavy Lift has signed a contract with Van Oord for a long term engagement at the 660MW Walney Extension offshore wind project in the UK. MV Svenja is chartered for 30 voyages for transportation of 87 monopiles from Rostock, Germany, to Belfast, Northern Ireland, 47 transiti

2 minutes read
  • LinkedIn
  • X
  • Email

Hamburg-headquartered SAL Heavy Lift has signed a contract with Van Oord for a long term engagement at the 660MW Walney Extension offshore wind project in the UK.

MV Svenja is chartered for 30 voyages for transportation of 87 monopiles from Rostock, Germany, to Belfast, Northern Ireland, 47 transition pieces from Aalborg, Denmark, and 40 transition pieces from Teesside, UK, to Belfast.

In total, 87 monopiles with diameter up to 8,40m and weight up to 970 tons per monopile, as well as 87 transition pieces will be transported.

The transition pieces are measuring up to 30m with up to 7m diameter and are weighing up to 579 tons.

This is the second major contract, SAL signed for offshore wind support in 2016.

SAL’s vessel MV Trina has just finalized the Veja Mate offshore wind farm project, transporting in total 68 transition pieces in eleven consecutive voyages from Aalborg to Eemshaven, the Netherlands.

The execution of SAL’s support at the Veja Mate project is what ”convinced Van Oord to choose SAL as their preferred carrier for the long term engagement at the Walney Offshore Wind Project.”

The Walney Extension OWF is located approximately 19 kilometres off the west coast of England, next to the 367.2MW Walney 1 & 2 offshore wind farms.

The wind farm will consist of 40 8MW MHI Vestas and 47 7MW Siemens wind turbines.

In November 2015, Van Oord was contracted by DONG Energy, the developer of the wind farm, to transport and install the 87 foundations at the site. The wind farm is expected to be operational in 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago