offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Full Steam Ahead at Nobelwind: First Turbine Up, OHVS Energized
Wind Farm Update

November 2, 2016 · about 9 years ago

Full Steam Ahead at Nobelwind: First Turbine Up, OHVS Energized

The Nobelwind offshore wind farm has reached two milestones with the last week of October, when the first MHI Vestas wind turbine was installed and the offshore high voltage substation (OHVS) powered, according to Parkwind’s social media pages. The OHVS for the Belgian offshore wind project, also kn

1 minutes read
  • LinkedIn
  • X
  • Email

The Nobelwind offshore wind farm has reached two milestones with the last week of October, when the first MHI Vestas wind turbine was installed and the offshore high voltage substation (OHVS) powered, according to Parkwind’s social media pages.

The OHVS for the Belgian offshore wind project, also known as Belwind 2 or Bligh Bank II, was installed at its destined location in the North Sea in September.

On 22 September, Jan De Nul installed the last foundation at the Nobelwind wind farm, and the company is now installing MHI Vestas 3.3MW turbines.

The Nobelwind offshore wind farm is located 47km from the coast of Belgium in the North Sea. When completed in 2017, the project will produce 651 GWh of clean energy annually, enough to provide energy for over 186.000 Belgian households.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago