offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Iemants and Jan De Nul Win Kriegers Flak OSS Foundations Work
Business & Finance

November 14, 2016 · about 9 years ago

Iemants and Jan De Nul Win Kriegers Flak OSS Foundations Work

Energinet.dk and 50Hertz Transmission GmbH have awarded Iemants and Jan De Nul Group with a contract to construct, install, ballast and protect gravity based foundations (GBFs) for two offshore substations. The two offshore substations will serve Vattenfall’s 600MW Kriegers Flak offshore wind farm i

2 minutes read
  • LinkedIn
  • X
  • Email

Energinet.dk and 50Hertz Transmission GmbH have awarded Iemants and Jan De Nul Group with a contract to construct, install, ballast and protect gravity based foundations (GBFs) for two offshore substations.

The two offshore substations will serve Vattenfall’s 600MW Kriegers Flak offshore wind farm in the Danish part of the Baltic Sea, and will also serve as an interconnector between the Danish and German power net.

The interconnector project is funded by the European Energy Programme for Recovery.

Kriegers Flak consists of two sections, each with its own substation. Kriegers Flak A, the west section, will have a total capacity of 200MW. The east section, Kriegers Flak B, will have a total capacity of 400MW.

Jan De Nul Group is in charge of the design, construction, transport and installation of the GBFs, whereas Iemants will take care of the detailed design, fabrication and transportation of the steel shafts and decks which will be placed on top of the GBFs. The steel structures will be (pre)fabricated at the Iemants’ facilities in Belgium.

The GBFs will be constructed on a pontoon based in the port of Zeebrugge, Belgium, and towed to the Baltic Sea.

In Denmark, Jan De Nul’s backhoe dredger Gian Lorenzo Bernini and the fallpipe vessel Adhémar de Saint-Venant will take care of the excavation of the foundation pit and installation of the gravel bed.

Once the pontoon with GBFs arrives in Denmark, it will be immersed to offload the structures upon which the foundations will be installed onto the gravel bed. Finally, the GBFs will be ballasted and protected through scour installation by means of the Adhémar de Saint-Venant.

The GBFs shall be installed offshore by the end of 2017, and the wind farm is expected to be operational by 2022, providing Danish households with the world’s cheapest energy generated by offshore wind turbines.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceGrid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago