offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Norfolk Swift Wraps Up Bathymetric Survey at Robin Rigg
Operations & Maintenance

November 16, 2016 · about 9 years ago

Norfolk Swift Wraps Up Bathymetric Survey at Robin Rigg

Norfolk Marine’s survey vessel the Norfolk Swift has completed a full site bathymetric survey of E.ON’s 174MW Robin Rigg offshore wind farm in the Solway Firth off Cumbria. The contract was awarded to Norfolk Marine by E.ON Climate & Renewables UK in early September 2016. The vessel was mobilised to

1 minutes read
  • LinkedIn
  • X
  • Email

Norfolk Marine’s survey vessel the Norfolk Swift has completed a full site bathymetric survey of E.ON’s 174MW Robin Rigg offshore wind farm in the Solway Firth off Cumbria.

The contract was awarded to Norfolk Marine by E.ON Climate & Renewables UK in early September 2016.

The vessel was mobilised to site from Norfolk Marine’s Lowestoft Yard by road transport to Whitehaven Marina in Cumbria from where the survey operations were conducted.

The Norfolk Swift has now returned to Lowestoft and has undergone a complete stern gear refit to be ready for the 2017 season, Norfolk Marine said.

The Norfolk Swift had already carried out survey works at Robin Rigg in May 2016. Prior to that, the vessel was deployed on another E.ON’s offshore wind farm, the 60MW Scroby Sands wind farm off Great Yarmouth to carry out maintenance works at the site.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

13 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

13 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago