offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Nighttime Turbine Installation at Nobelwind
Wind Farm Update

November 17, 2016 · about 9 years ago

Nighttime Turbine Installation at Nobelwind

Installation of wind turbines at the Nobelwind offshore wind farm in Belgium is underway and some of the works are being done during nighttime due to weather conditions. “This is a tricky time of year where every ‘good weather’ window must be optimised, which can result in night-time installations,”

1 minutes read
  • LinkedIn
  • X
  • Email

Installation of wind turbines at the Nobelwind offshore wind farm in Belgium is underway and some of the works are being done during nighttime due to weather conditions.

“This is a tricky time of year where every ‘good weather’ window must be optimised, which can result in night-time installations,” MHI Vestas said via social media. The wind turbine manufacturer is delivering 50 of its 3.3MW turbines for the project.

The turbine installation at the Belgian offshore wind farm, also known as Belwind 2 or Bligh Bank II, commenced at the end of the last month, when also the offshore high voltage substation (OHVS) was energized.

Jan De Nul, which installed the last foundation at the Nobelwind wind farm on 22 September, is now installing MHI Vestas turbines.

The Nobelwind offshore wind farm is located 47km from the coast of Belgium in the North Sea. When completed in 2017, the project will produce 651 GWh of clean energy annually, enough to provide energy for over 186.000 Belgian households.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago