offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Germany Confirms Offshore Grid Development Plan by 2025
Authorities

November 28, 2016 · about 9 years ago

Germany Confirms Offshore Grid Development Plan by 2025

German Federal Network Agency (Bundesnetzagentur) has confirmed a plan for the offshore grid development by 2025 (Offshore-Netzentwicklungsplan 2025), which regulates the connections of wind farms in the North and Baltic Seas to the German transmission network. “Electricity generation from wind farm

1 minutes read
  • LinkedIn
  • X
  • Email

German Federal Network Agency (Bundesnetzagentur) has confirmed a plan for the offshore grid development by 2025 (Offshore-Netzentwicklungsplan 2025), which regulates the connections of wind farms in the North and Baltic Seas to the German transmission network.

“Electricity generation from wind farms in the North Sea and the Baltic Sea is a central component of the energy transition. The 2025 offshore grid development plan forms a reliable basis for further development of offshore wind energy and a smooth transition towards competitive tendering of new projects,” said Jochen Homann , President of the Federal Network Agency .

The confirmed offshore network development plan comprises four network connections for offshore wind generation in the North Sea and three network connections in the Baltic Sea. These serve to develop spatially connected wind farms at sea (so-called clusters), which were defined by the Federal Offshore Offshore Plan of the Federal Maritime and Hydrographic Agency.

The offshore network development plan provides an order of individual connections as well as the date of commissioning and planned completion.

The plan also implements the requirements of the national offshore wind energy act for the expansion corridor for offshore wind power from 2021 to 2025 and allows for connections of the wind farm projects participating in the tenders from 2021 to 2025.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesGrid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

18 days ago

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

19 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

18 days ago
Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

19 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago