offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›First Galloper Monopiles Ready to Go
Wind Farm Update

December 7, 2016 · about 9 years ago

First Galloper Monopiles Ready to Go

First monopiles for the Galloper offshore wind farm have been loaded onto a barge and will soon be transported to the main installation vessel, according to Innogy’s social media pages. In November 2015, GeoSea won a EUR 340 million contract to design, fabricate and install 56 steel monopile foundat

1 minutes read
  • LinkedIn
  • X
  • Email

First monopiles for the Galloper offshore wind farm have been loaded onto a barge and will soon be transported to the main installation vessel, according to Innogy’s social media pages.

In November 2015, GeoSea won a EUR 340 million contract to design, fabricate and install 56 steel monopile foundations for the Galloper project and subcontracted Sif Group and Smulders to produce the monopiles and transition pieces.

In September 2016, Sif assembled the first monopile for the project in its new assembly facility at Maasvlakte II in Rotterdam.

The scour protection works for the foundations will be undertaken by Tideway, GeoSea’s sister company, both being part of the DEME Group.

The Galloper offshore wind farm, located some 27 km off the Suffolk coast, will feature 56 Siemens’ 6MW wind turbines and is expected to be fully operational in 2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago