offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›GeoSea Installs First Foundation at Galloper
Vessels

December 28, 2016 · about 9 years ago

GeoSea Installs First Foundation at Galloper

Offshore marine engineering specialist GeoSea installed the first of fifty-six turbine foundations at the 336MW Galloper offshore wind farm on Wednesday, 28th December. The components are being loaded-out onto the GeoSea installation vessel, Innovation, in Rotterdam and Vlissingen, with the installa

2 minutes read
  • LinkedIn
  • X
  • Email

Offshore marine engineering specialist GeoSea installed the first of fifty-six turbine foundations at the 336MW Galloper offshore wind farm on Wednesday, 28th December.

The components are being loaded-out onto the GeoSea installation vessel, Innovation, in Rotterdam and Vlissingen, with the installation phase planned to be complete by early summer next year.

Tideway, part of Deme Group, is carrying out the scour protection works for the foundations, with the programme of works well underway.

GeoSea sub-contracted Sif Group and Smulders to produce the monopiles and transition pieces. Each foundation is around 85 metres in length and 7.5 metres in diameter, and weighs around up to 1,200 tonnes.

The installation of the fifty-six 6MW Siemens turbines is expected to start in the early summer of 2017.

Project Director, Toby Edmonds, said: “This time last year we had recently achieved Financial Close for the project and announced our new project partners. In the last year we have built the majority of the onshore substation infrastructure; connected the first of two export cables; opened the project Offshore Construction Coordination Base in Lowestoft; celebrated the Siemens assembly base ground-breaking ceremony in Great Yarmouth; and submitted the planning application for our Operations & Maintenance Base in Harwich. Next year, the bulk of our focus will, of course, be on offshore construction, but we will also be finishing the installation of the onshore electrical infrastructure and constructing the Operations & Maintenance base.”

Galloper offshore wind farm, located approximately 30 kilometres off the coast of Suffolk, is an extension of the existing and fully operational Greater Gabbard wind farm and represents an expected investment potential of around GBP 1.5 billion.

innogy SE is leading the development and construction of the project on behalf of its partners who also include the UK Green Investment Bank, Siemens Financial Services and Macquarie Capital.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago