offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›ECN Releases Offshore Wind Access Report, Introduces O&M Access Tool
Operations & Maintenance

January 5, 2017 · about 9 years ago

ECN Releases Offshore Wind Access Report, Introduces O&M Access Tool

Energy research Centre of the Netherlands (ECN) has released Offshore Wind Access 2017 report, which provides an overview of the existing and under-development access systems for offshore wind operation and maintenance (O&M). Besides the conventional method of access to the boat landing through crew

2 minutes read
  • LinkedIn
  • X
  • Email

Energy research Centre of the Netherlands (ECN) has released Offshore Wind Access 2017 report, which provides an overview of the existing and under-development access systems for offshore wind operation and maintenance (O&M).

Besides the conventional method of access to the boat landing through crew transfer vessels, motion compensated gangways on the deck of service operation vessels have entered the market during the last decade, moving the maintenance base offshore. The report shows the growth of this market in alignment with the needs for more efficient and safer transfer of technicians and cargo to offshore wind turbines.

In the report, ECN also used a case study to illustrate how its O&M Access tool can be used to evaluate the impact of different ways of access on the performance of the wind farm.

As far as the results of the O&M modelling are concerned, it was made clear that distance from port is crucial for selecting the most suitable O&M strategy, according to ECN.

The case study involved a 720MW wind farm 50km away from shore, and the most cost-effective option showed to be a harbour-based strategy supported by helicopter access. “However, results are based on the model developed in this work and each wind farm needs a separate analysis. In general, accessibility is only one parameter for selecting an access system but a holistic O&M modelling approach is required that takes into account interactions with all parts of the O&M supply chain to make a safe conclusion, as the one proposed by ECN O&M Access tool,” ECN said.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceR&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

17 days ago

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

22 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

17 days ago
New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

22 days ago