offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Largest Ever 8MW Order Lands on MHI Vestas Desk
Business & Finance

January 13, 2017 · about 9 years ago

Largest Ever 8MW Order Lands on MHI Vestas Desk

Following the approval from the German consenting authority ‘Bundesamt für Seeschifffahrt und Hydrographie’ (BSH), DONG Energy placed an order with MHI Vestas Offshore Wind for the 450MW Borkum Riffgrund 2 project, marking the largest ever order for the wind turbine manufacturer.

1 minutes read
  • LinkedIn
  • X
  • Email

Following the approval from the German consenting authority ‘Bundesamt für Seeschifffahrt und Hydrographie’ (BSH), DONG Energy placed an order with MHI Vestas Offshore Wind for the 450MW Borkum Riffgrund 2 project, marking the largest ever order for the wind turbine manufacturer.

The V164-8.0 MW turbines will utilise the MAX Power system from the MVOW MAX Performance portfolio to be able to deliver a maximum output of 8.3MW.

The contract also includes a five-year full-scope service with an availability guarantee, ensuring optimised performance of the wind power plant with maximum power output.

The order is the third from DONG Energy for the V164-8.0 MW turbine, following Burbo Bank Extension (258MW) and Walney Extension (330MW) and brings the order pipeline with DONG Energy to over 1GW.

When fully commissioned in the first half of 2019, the Borkum Riffgrund 2 will be one of the largest offshore wind farms in Germany measured by total capacity and will be able to produce green energy to cover the consumption of 460,000 German households.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago