offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Brave Tern Arrives at Wikinger OWF Site
Vessels

January 18, 2017 · about 9 years ago

Brave Tern Arrives at Wikinger OWF Site

Fred .Olsen Windcarrier’s jack-up vessel Brave Tern has arrived at the Wikinger construction site after sailing out last night, a spokesman from Iberdrola told Offshore WIND.

1 minutes read
  • LinkedIn
  • X
  • Email

Fred .Olsen Windcarrier’s jack-up vessel Brave Tern has arrived at the Wikinger construction site after sailing out last night, a spokesman from Iberdrola told Offshore WIND .

The vessel will install 70 Adwen 5MW wind turbines at the offshore wind farm in the German sector of the Baltic Sea.

After being loaded with turbine components at the Port of Sassnitz-Mukran earlier this month, the Brave Tern had been waiting for a weather window to start working at the site.

Installation works are now about to commence.

C-bed’s floating hotel Wind Ambition has been deployed on the Wikinger project to support the turbine installation and commissioning by providing accommodation.

The EUR 1.4 billion project is scheduled to be operational by the end of this year and represents Iberdrola’s first offshore wind farm in German waters.

Check out the photos of the storage site and the load-out of rotors at the Port of Sassnitz-Mukran:

Offshore WIND Staff

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago