offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Photo of the Day: Seajacks Scylla Puts Huisman Crane to Use at Veja Mate
Vessels

February 6, 2017 · about 9 years ago

Photo of the Day: Seajacks Scylla Puts Huisman Crane to Use at Veja Mate

Huisman Equipment has shared a photo of the jack-up vessel Seajacks Scylla installing one of the 67 Siemens 6MW turbines at the 402MW Veja Mate offshore wind farm using a 1,500mt Huisman Leg Encircling Crane. Seajacks Scylla and Fred. Olsen Windcarrier’s jack-up vessel Bold Tern started loading the

1 minutes read
  • LinkedIn
  • X
  • Email

Huisman Equipment has shared a photo of the jack-up vessel Seajacks Scylla installing one of the 67 Siemens 6MW turbines at the 402MW Veja Mate offshore wind farm using a 1,500mt Huisman Leg Encircling Crane.

Seajacks Scylla and Fred. Olsen Windcarrier’s jack-up vessel Bold Tern started loading the first batch of turbine components from the Port of Esbjerg in Denmark in early January.

Seajacks Scylla had already worked on the project, installing 67 monopiles at the site located some 95 kilometres north west of the island of Borkum in the German part of the North Sea.

Veja Mate is a EUR 1.9 billion offshore wind project owned by the Highland Group Holdings Ltd, Siemens Financial Services, and CI II, managed by Copenhagen Infrastructure Partners.

The wind farm is expected to be fully operational by late 2017/early 2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

13 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

13 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago